Splash 2!

After a full year in the yard Estrelitta was relaunched last week with a new main cabin. Much work still to be done but she is livable at dockside.

‘D’ Dock
Sitting Pretty
New Rigging too
Galley Stbd
Fresh and Seawater double stroke foot pumps for these spigots
Galley port
Enyo propane cooktop
Dinette aft
Dinette fwd
Hinged chart table
Looking forward
Stb berth
Stbd berth looking aft
Hanging locker
Potty

Pre-Launch Photos

Sitting in the boatyard before launch.  I have word that all deck hardware has been installed.  The mast will be stepped with all new rigging, VHF antenna, anchor light, steaming light, deck flood and internal wiring after launch.

Friday10-25-13001

Friday10-25-13003

Project Creep and Photos

Top coating (with net non-skid) has been completed, windows installed and bottom primed.   All that remains before launching Estrellita for the Winter is bottom paint and deck hardware.

The mast will be stepped while she is in the water but before that I’ve decided that the mast must be painted and properly re-wired with VHF radio antenna, LED anchor light and combination incandescent steaming light and foredeck light.

windows_002

bottomprime

cabintopnonskid

propanelockers

cockpit

halyard-winches